top of page
Colled Rolled Profile Sheet Piles (CRZ)
ESC Steel LLC
USA flag
Ph.  (980) 689 4388  / (980) 892 2486
Canada flag
Ph. +1 (902) 442 0800
  • Facebook App Icon
  • Twitter App Icon
  • LinkedIn Social Icon
  • YouTube Social  Icon
  • Instagram
APP STORE.png
google play.PNG

ESC-CRZ SERIES

COLD ROLLED PROFILE SHEET PILES

Cold Rolled Sheet piling has made a substantial progression in rolling technology and usage around the world. The ESC-CRZ Series is at the forefront of this development with  a series of high quality Z-profile sheet piles which provide an optimal strength to weight ratio. Interlocking clutches on the CRZ sheet piles are located at the outer fibre. This results in an optimized section profile for high strength and low material weight. A High Moment of Inertia reducing deflection improves on  serviceability requirements. A constant section thickness results in better driving stiffness. The wider profile width reduces handling and installation time with usual driving equipment. The wider profile reduces the number of interlocks required for a set wall run length, improving water-tightness capabilities.

TECHNICAL SPECIFICATIONS
ESC CRZ sheet piles
Technical Specifications
Section Modulus Range

20.4-93in3/ft

Width Range (single)

​22.8-31.5in

Thickness Range

​0.19-0.62in

Production Standards

​BS EN 10249 Part 1 & 2

​Steel Grades​
  • S235JR, S275JR, S355JR, S355JO

  • ASTM A572 Gr42, Gr50, Gr60

  • Q235B, Q345B, Q345C, Q390B, Q420B

  • Others available on request

Length

114.8ft maximum but any project specific length can be produced

Delivery Options
  • Single or Pairs

  • Pairs either loose, welded or crimped

  • Lifting Hole

  • Grip Plate

  • By container (38.7ft or less) or Break Bulk

  • Corrosion Protection Coatings

Corner Piles

ESC is able to offer 3 options for Corner Pile configurations in the ESC-CRZ Series. Option 1 is frequently used when the installation contractor prefers to create their own corner piles on site depending on the as-driven layout. However this produces wastage on the offcut pile. Option 2 allows welding at the mill or on site and provides the installation contractor with more flexibility on  corner pile location. Option 3 provides an option where no welding is required. Option 3 provides increased accuracy at corners that are deviated from the typical 90˚ corner.
 

PRODUCT IMAGES
Product Images

PROJECT CASE STUDIES

Jetty - Abu Dhabi, UAE

Jetty - Abu Dhabi, UAE

Al Saif, Abu Dhabi

Al Saif, Abu Dhabi

Permanent Basement Wall, Tijuana

Permanent Basement Wall, Tijuana

Temporary Works, New York, USA

Temporary Works, New York, USA

Al Saif, Abu Dhabi, UAE

Al Saif, Abu Dhabi, UAE

Case Studies
bottom of page