Tubular piles installation
ESCSteel_1.png
Ph.  (704) 654 0321  /  (281) 205 7261
Ph. +1 (604) 235 1996
  • Facebook App Icon
  • Twitter App Icon
  • LinkedIn Social Icon
  • YouTube Social  Icon
  • Instagram

ESC PROJECT CASE STUDIES

Book I : Project Case Studies
ESC Global Project Case Studies Book II
ESC Global Project Case Studies Book III
Steel Pipe Projects Case Studies
Combi Wall Projects
Show More
Al Ittihad Footbridge
Al Ittihad Footbridge
Al Jazeera Port Construction
Al Jazeera Port Construction
Al Jeer Fishing Harbour
Al Jeer Fishing Harbour
Al Khawaneej Second Sewerage
Barrow Island Load-Out Jetty
Bascule Bridge Cofferdam
Baynoonah Tunnel
BHP Gas Pipe
BHP Tug Harbour Pipes & Mooring Pipe
BHP Tug Harbour Pontoon
Bunge Grain Terminal
Cruise Ship Docking Facility
District Colling Planet Extension
Duqm Liquid Bulk Berths
Eurotank Oil Terminal
Falklands Mare Harbour
Hinkley Point C - Aggregate Jetty
Jalan Duta, KL, Road Widening
Johor Bahru Convention Centre
Jubail Supply Base
Kaohsuing Port
Liquid Bulk Terminal
Melaka River Beautification
Modular Transport Beam System
Mumbai Trans Harbour Link
Ohau Channel Diversion
Palawan Supply of Anodes & Tie Rods
Port of Everett
Port of Fujairah Phase 1, UAE
Port of Fujairah, OT2, Phase 2
Port Lafito
Port of Veracruz
Ras Al Khaimah Port Extension
Rondout Tunnel Project
Sabah Oil & Gas Terminal
Sewer Network, UAE
South Breakwater Berths
Stevin Rock Berth - New Quay Wall
Tankput 19 Vopak Terminal
TMCLK Seawall for Northern Reclamation Project
Victoria Harbour
WATCO Breakwater (Berths 3 & 4)
YCI Water Intake Project
Show More

Our Products

Download our App "ESC GROUP"

  • ESC Steel facebook
  • ESC Steel Twitter
  • ESC Steel Linkedin
  • ESC Group Youtube
  • ESC Steel Instagram