ESC-Group-Logo-R-PNG.png
Misi.png

ESC PROJECT CASE STUDIES

Al Ittihad Footbridge
Al Jeer Fishing Harbour
Al Khawaneej Second Sewerage System
Barrow Island Load Out Jetty
Bascule Bridge Cofferdam
Baynoonah Tunnel
BHP Gas Pipe
BHP Tug Harbour Pipes & Mooring Pipe
BHP Tug Harbour Pontoon Steel Struc.
Bunge Grain Terminal
Cruise Ship Docking Facility
District Cooling Planet Extension
Duqm Liquid Bulk Berths
Eurotank Oil Terminal
Falklands Mare Harbour
Hinkly Point C - Aggregate Jetty
Jalan Duta, KL Road Widening Project
Johor Bahru Convention Centre
Jubail Supply Base
Kaohsuing Port Combi Wall
Liquid Bulk Terminal Rubis
Melaka River Beautification
Modular Transport Beam System
Ohau Channel Diversion
Palawan Supply of Anodes & Tie Rods
Port of Everett
Port of Fujairah, OT2 Phase 1
Port Lafito
Port of Fujairah, OT2, Phase 2
Port of Veracruz
RAAF Aircraft Hangar
Ras Al Khaimah Port, Phase IA Ext.
Rondout Tunnel Project
Sabah Oil & Gas Terminal
Sewer Network, UAE
South Breakwater Berths
Stevin Rock Berth New Quay Wall
Tankput 19 VOPAK Terminal
TMCLK Seawall for Northern Reclamati
TWR Control Tower
Victoria Harbour
WATCO Breakwater (Berths 3 & 4)
Show More